Référence pièce
Vous pouvez trouver ici le numéro
de référence lié au produit recherché.
L'aperçu 3D n'est pas disponible, car aucun code article n'a été généré.
Référence pièce |
Prix unitaire standard
| Quantité minimale de commande | Remise sur volume | RoHS | Tip shape | Material | Shank diameter D tolerance | Tip length | D (Shank diameter) (mm) | L (L dimension) (mm) | LC (Full length alteration) (mm) | LCT (Head thickness tolerance change + Total length alteration) (mm) | LCX (Full length change with no change to tip length B) (mm) | LMT (Head thickness tolerance change + Total length alteration) (mm) | P (Tip dimension) (mm) | PC (Tip dimension alteration) (mm) | R (Tip corner R) (mm) | W (Tip dimension) (mm) | WC (Tip dimension alteration) (mm) | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 8 | - | - | 32 ~ 79.9 | - | - | - | 2.5 ~ 2.99 | 0.15 ~ 3.97 | - | 2.5 ~ 2.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 8 | - | - | - | - | 32 ~ 79.9 | 3 ~ 7.97 | - | 0.15 ~ 3.97 | 3 ~ 7.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 8 | - | - | - | - | 32 ~ 79.9 | 3 ~ 7.97 | - | 0.15 ~ 3.97 | - | 2.5 ~ 2.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 8 | - | - | - | - | 32 ~ 79.9 | - | 2.5 ~ 2.99 | 0.15 ~ 3.97 | 3 ~ 7.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 8 | - | - | - | - | 32 ~ 79.9 | - | 2.5 ~ 2.99 | 0.15 ~ 3.97 | - | 2.5 ~ 2.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 10 | 40 ~ 80 | - | - | - | - | 3 ~ 9.97 | - | 0.15 ~ 4.97 | 3 ~ 9.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 10 | 40 ~ 80 | - | - | - | - | 3 ~ 9.97 | - | 0.15 ~ 4.97 | - | 2.8 ~ 2.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 10 | 40 ~ 80 | - | - | - | - | - | 2.8 ~ 2.99 | 0.15 ~ 4.97 | 3 ~ 9.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 10 | 40 ~ 80 | - | - | - | - | - | 2.8 ~ 2.99 | 0.15 ~ 4.97 | - | 2.8 ~ 2.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 10 | - | 31 ~ 79.9 | - | - | - | 3 ~ 9.97 | - | 0.15 ~ 4.97 | 3 ~ 9.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 10 | - | 31 ~ 79.9 | - | - | - | 3 ~ 9.97 | - | 0.15 ~ 4.97 | - | 2.8 ~ 2.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 10 | - | 31 ~ 79.9 | - | - | - | - | 2.8 ~ 2.99 | 0.15 ~ 4.97 | 3 ~ 9.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 10 | - | 31 ~ 79.9 | - | - | - | - | 2.8 ~ 2.99 | 0.15 ~ 4.97 | - | 2.8 ~ 2.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 10 | - | - | 32 ~ 79.9 | - | - | 3 ~ 9.97 | - | 0.15 ~ 4.97 | 3 ~ 9.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 10 | - | - | 32 ~ 79.9 | - | - | 3 ~ 9.97 | - | 0.15 ~ 4.97 | - | 2.8 ~ 2.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 10 | - | - | 32 ~ 79.9 | - | - | - | 2.8 ~ 2.99 | 0.15 ~ 4.97 | 3 ~ 9.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 10 | - | - | 32 ~ 79.9 | - | - | - | 2.8 ~ 2.99 | 0.15 ~ 4.97 | - | 2.8 ~ 2.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 10 | - | - | - | - | 32 ~ 79.9 | 3 ~ 9.97 | - | 0.15 ~ 4.97 | 3 ~ 9.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 10 | - | - | - | - | 32 ~ 79.9 | 3 ~ 9.97 | - | 0.15 ~ 4.97 | - | 2.8 ~ 2.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 10 | - | - | - | - | 32 ~ 79.9 | - | 2.8 ~ 2.99 | 0.15 ~ 4.97 | 3 ~ 9.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 10 | - | - | - | - | 32 ~ 79.9 | - | 2.8 ~ 2.99 | 0.15 ~ 4.97 | - | 2.8 ~ 2.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 13 | 40 ~ 80 | - | - | - | - | 6 ~ 12.97 | - | 0.15 ~ 6.47 | 6 ~ 12.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 13 | 40 ~ 80 | - | - | - | - | 6 ~ 12.97 | - | 0.15 ~ 6.47 | - | 5 ~ 5.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 13 | 40 ~ 80 | - | - | - | - | - | 5 ~ 5.99 | 0.15 ~ 6.47 | 6 ~ 12.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 13 | 40 ~ 80 | - | - | - | - | - | 5 ~ 5.99 | 0.15 ~ 6.47 | - | 5 ~ 5.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 13 | - | 31 ~ 79.9 | - | - | - | 6 ~ 12.97 | - | 0.15 ~ 6.47 | 6 ~ 12.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 13 | - | 31 ~ 79.9 | - | - | - | 6 ~ 12.97 | - | 0.15 ~ 6.47 | - | 5 ~ 5.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 13 | - | 31 ~ 79.9 | - | - | - | - | 5 ~ 5.99 | 0.15 ~ 6.47 | 6 ~ 12.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 13 | - | 31 ~ 79.9 | - | - | - | - | 5 ~ 5.99 | 0.15 ~ 6.47 | - | 5 ~ 5.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 13 | - | - | 32 ~ 79.9 | - | - | 6 ~ 12.97 | - | 0.15 ~ 6.47 | 6 ~ 12.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 13 | - | - | 32 ~ 79.9 | - | - | 6 ~ 12.97 | - | 0.15 ~ 6.47 | - | 5 ~ 5.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 13 | - | - | 32 ~ 79.9 | - | - | - | 5 ~ 5.99 | 0.15 ~ 6.47 | 6 ~ 12.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 13 | - | - | 32 ~ 79.9 | - | - | - | 5 ~ 5.99 | 0.15 ~ 6.47 | - | 5 ~ 5.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 13 | - | - | - | - | 32 ~ 79.9 | 6 ~ 12.97 | - | 0.15 ~ 6.47 | 6 ~ 12.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 13 | - | - | - | - | 32 ~ 79.9 | 6 ~ 12.97 | - | 0.15 ~ 6.47 | - | 5 ~ 5.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 13 | - | - | - | - | 32 ~ 79.9 | - | 5 ~ 5.99 | 0.15 ~ 6.47 | 6 ~ 12.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 13 | - | - | - | - | 32 ~ 79.9 | - | 5 ~ 5.99 | 0.15 ~ 6.47 | - | 5 ~ 5.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 16 | 40 ~ 80 | - | - | - | - | 6 ~ 15.97 | - | 0.15 ~ 7.97 | 6 ~ 15.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 16 | 40 ~ 80 | - | - | - | - | 6 ~ 15.97 | - | 0.15 ~ 7.97 | - | 5 ~ 5.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 16 | 40 ~ 80 | - | - | - | - | - | 5 ~ 5.99 | 0.15 ~ 7.97 | 6 ~ 15.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 16 | 40 ~ 80 | - | - | - | - | - | 5 ~ 5.99 | 0.15 ~ 7.97 | - | 5 ~ 5.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 16 | - | 31 ~ 79.9 | - | - | - | 6 ~ 15.97 | - | 0.15 ~ 7.97 | 6 ~ 15.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 16 | - | 31 ~ 79.9 | - | - | - | 6 ~ 15.97 | - | 0.15 ~ 7.97 | - | 5 ~ 5.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 16 | - | 31 ~ 79.9 | - | - | - | - | 5 ~ 5.99 | 0.15 ~ 7.97 | 6 ~ 15.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 16 | - | 31 ~ 79.9 | - | - | - | - | 5 ~ 5.99 | 0.15 ~ 7.97 | - | 5 ~ 5.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 16 | - | - | 32 ~ 79.9 | - | - | 6 ~ 15.97 | - | 0.15 ~ 7.97 | 6 ~ 15.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 16 | - | - | 32 ~ 79.9 | - | - | 6 ~ 15.97 | - | 0.15 ~ 7.97 | - | 5 ~ 5.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 16 | - | - | 32 ~ 79.9 | - | - | - | 5 ~ 5.99 | 0.15 ~ 7.97 | 6 ~ 15.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 16 | - | - | 32 ~ 79.9 | - | - | - | 5 ~ 5.99 | 0.15 ~ 7.97 | - | 5 ~ 5.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 16 | - | - | - | - | 32 ~ 79.9 | 6 ~ 15.97 | - | 0.15 ~ 7.97 | 6 ~ 15.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 16 | - | - | - | - | 32 ~ 79.9 | 6 ~ 15.97 | - | 0.15 ~ 7.97 | - | 5 ~ 5.99 | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 16 | - | - | - | - | 32 ~ 79.9 | - | 5 ~ 5.99 | 0.15 ~ 7.97 | 6 ~ 15.97 | - | ||
- | 1 | Devis | 10 | R | Carbide V30 (HIP) | +0.005/0 | S | 16 | - | - | - | - | 32 ~ 79.9 | - | 5 ~ 5.99 | 0.15 ~ 7.97 | - | 5 ~ 5.99 | ||
- | 1 | Devis | 10 | A | Carbide super fine grain (HIP) | +0.005/0 | L | 4 | 50 ~ 70 | - | - | - | - | 1.5 ~ 3.99 | - | - | - | - | ||
- | 1 | Devis | 10 | A | Carbide super fine grain (HIP) | +0.005/0 | L | 4 | - | 36 ~ 69.9 | - | - | - | 1.5 ~ 3.99 | - | - | - | - | ||
- | 1 | Devis | 10 | A | Carbide super fine grain (HIP) | +0.005/0 | L | 4 | - | - | 36 ~ 69.9 | - | - | 1.5 ~ 3.99 | - | - | - | - | ||
- | 1 | Devis | 10 | A | Carbide super fine grain (HIP) | +0.005/0 | L | 4 | - | - | - | 27 ~ 69.9 | - | 1.5 ~ 3.99 | - | - | - | - | ||
- | 1 | Devis | 10 | A | Carbide super fine grain (HIP) | +0.005/0 | L | 4 | - | - | - | - | 36 ~ 69.9 | 1.5 ~ 3.99 | - | - | - | - | ||
- | 1 | Devis | 10 | A | Carbide super fine grain (HIP) | +0.005/0 | L | 5 | 50 ~ 70 | - | - | - | - | 2 ~ 4.99 | - | - | - | - | ||
- | 1 | Devis | 10 | A | Carbide super fine grain (HIP) | +0.005/0 | L | 5 | 50 ~ 70 | - | - | - | - | - | 1.8 ~ 2 | - | - | - |
Loading...
Tip shapes | One-step | Jector | With air hole | Surface treatment | Lapping |
---|---|---|---|---|---|
Shank (mounting part) shape | Standard |
Configurer
Propriétés de base
Tip shape
Material
Shank diameter D tolerance
Tip length
D (Shank diameter)(mm)
L (L dimension)(mm)
LC (Full length alteration)(mm)
LCT (Head thickness tolerance change + Total length alteration)(mm)
LCX (Full length change with no change to tip length B)(mm)
LMT (Head thickness tolerance change + Total length alteration)(mm)
P (Tip dimension)(mm)
PC (Tip dimension alteration)(mm)
[1.8-1.99/0.01mmunités][2.5-2.99/0.01mmunités][5-5.99/0.01mmunités][1.8-2/0.001mmunités][2.3-3/0.001mmunités][5-6/0.001mmunités][8-10/0.001mmunités]
R (Tip corner R)(mm)
W (Tip dimension)(mm)
WC (Tip dimension alteration)(mm)
Type
Filtrer par type de données CAO
Propriétés optionnelles